Area → Quick Capture
Select or adjust an area and annotate it right in the fast capture window.
Capture an area and annotate it in Quick Capture. Copy the result or continue in the full editor. Everything stays local.
CAPTURE AND QUICK MODE
Start a capture from the app, tray, or a configured keyboard shortcut.
Select or adjust an area and annotate it right in the fast capture window.
Copy the image, save a PNG, add it to local history, or continue in the full editor.
A full-screen or window capture opens for detailed editing. You can open an existing image too.
Capture modes vary by OS. See platform details ↗
LOCAL AGENTS · MCP
Enable MCP in settings. A compatible agent can start a capture, read local history, edit the open document, inspect a preview, and export a PNG. Each client has its own revocable key.
The app does not provide an AI model; the MCP client controls what it sends to its model. Connect an agent ↗
THE TOOLKIT
From a quick note to a step-by-step guide, right on your screenshot.
Point to a detail with a straight, curved or elbow arrow. Adjust the line and arrowheads.
Underline important details with a straight line. Snap to the axes and choose a solid, dashed or dotted stroke.
Frame a detail with a shape, block arrow or flowchart symbol. Choose an outline, solid fill or gradient.
Draw freely with a precise pen or smoothing. Hold Shift to add straight segments.
Highlight text and details on light or dark backgrounds. Choose an automatic effect, colour and intensity.
Write directly on the screenshot. Built-in fonts, formatting, lists and caption backgrounds work offline.
Mark steps with automatic numbering. Choose a badge shape and add a caption beside it.
Connect a detail to a caption with a straight, curved or stepped line. Adjust the endpoints and caption style.
Conceal data with pixelation, blur or a solid fill. Draw a rectangle or a freeform outline.
Highlight one or more areas by dimming the rest of the screenshot. Adjust their shape and the dimming.
Magnify a detail and connect it to its source with a pointer. Adjust the zoom, lens shape and border.
Measure distances in pixels or as a percentage of the image dimensions. Copy the length and angle from the settings.
Pick a colour from the visible screenshot, copy its HEX value and use it in annotations.
Keep the part of the screenshot that matters. Crop freely or choose an aspect ratio.
Insert a PNG, JPEG, WebP or SVG. Build a composition and adjust borders, rounded corners and opacity.
Add one of 100 built-in emoji. Search for the one you need and resize it — everything works offline.
Select and move objects. Adjust their properties individually or as a group.
Move around the canvas while your annotations stay in place.
Your screenshots stay on your device.No account or cloud processing.
DOWNLOAD · v0.1.26
Choose your operating system and installer.
Unsigned installer. SmartScreen may show a warning.
Intel and Apple Silicon. Unsigned; Gatekeeper may show a warning.
Ubuntu 22.04+. Wayland capture depends on desktop portals.